The schedule listed below is not a guarantee and is an estimate when you should expect to receive your order once it has been placed. These are approximate delivery dates based on the product being in stock, or the estimated lead time if the item is made to order. When a product is in stock, it does take anywhere from 1 to 4 days for an item to be entered, packed and ready to ship. The possibility of seasonal delays and delays in transit is always a consideration. Actual lead time may vary based on location.
| Outdoor Furniture |
In Stock |
Made to Order |
Lead Time |
| Wrought Iron - Designer |
|
x |
3 to 5 weeks |
| Aluminum Frame
- Restaurant Seating |
x |
|
1.5 to 3 weeks |
| Heating
Solutions - Radiant |
x |
x |
3 to 8 weeks |
| Woven Wicker
Restaurant Seating |
x |
|
1.5 to 3 weeks |
| Woven Wicker
Lounge Seating |
x |
x |
2 to 6 weeks |
| Rattan-Design
Aluminum Frame Seating |
x |
|
1.5 to 3 weeks |
| Wrought Iron -
European |
x |
|
1.5 to 2.5 weeks |
| Wrought Iron -
Café |
x |
|
1.5 to 2.5 weeks |
| Steel Frame -
Italian Seating |
x |
|
1.5 to 2.5 weeks |
| Steel Frame -
International |
x |
|
1.5 to 2.5 weeks |
| Grosfillex
Contract Resin Furniture |
x |
|
2 to 3 weeks |
| Teak - Shorea
Wood |
x |
|
1.5 to 3 weeks |
| Cast Aluminum
Seating |
|
x |
3 to 6 weeks |
| Outdoor
Tabletops |
|
|
|
| Solo Collection |
x |
|
1.5 to 2.5 weeks |
| Party Collection |
|
x |
4 to 6 weeks |
| Quarizz Collection |
|
x |
3 to 5 weeks |
| Urban Textures Collection |
|
x |
3 to 5 weeks |
| Cultured Granite Collection |
|
x |
3 to 5 weeks |
| Faux Leather Collection |
|
x |
3 to 5 weeks |
| Faux Travertine Collection |
|
x |
3 to 5 weeks |
| Cultured Marble Collection |
|
x |
3 to 5 weeks |
| Classic Collection |
x |
|
1.5 to 2.5 weeks |
| SC Melamine Collection |
x |
|
1.5 to 2.5 weeks |
| Outdoor Table
Bases |
x |
|
1.5 to 2.5 weeks |
| Umbrellas
& Bases |
|
|
|
| Umbrellas |
|
x |
2 to 4 weeks |
| Umbrella Bases |
x |
|
1.5 to 2.5 weeks |
| Aluminum Frame
- Pool Furniture |
x |
x |
2 to 5 weeks |
| Exterior
Cushions |
|
x |
3 to 5 weeks |
| Beach Chairs |
|
x |
3 to 4 weeks |
| Cabanas/Pavilions |
|
x |
3 to 4 weeks |
| Emeco 111 Navy
Recycled Chair |
x |
x |
2 to 4 weeks |
| Contract Resin
Furniture |
x |
x |
1.5 to 4 weeks |
| Bistro Metal
Seating |
x |
|
1.5 to 3 weeks |
| Performance
Resin |
x |
x |
1.5 to 5 weeks |
| European Café |
x |
|
1.5 to 2.5 weeks |
| Special Events
Seating |
x |
|
1.5 to 2.5 weeks |
| Site
Furnishings |
|
x |
3 to 6 weeks |
| Heating
Solutions - Gas |
x |
|
1.5 to 2.5 weeks |
| Specialty
Umbrellas |
|
x |
3 to 5 weeks |
| Site Seating |
|
x |
3 to 5 weeks |
| Wood Composite
Seating |
|
x |
2 to 4 weeks |
| Cast Aluminum
Seating - Designer |
|
x |
3 to 5 weeks |
| |
| Indoor Furniture |
In Stock |
Made to Order |
Lead Time |
| Italian Style Bonded Leather |
|
x |
3 to 4 weeks |
| Holsag
European Beechwood Dining Chairs |
|
x |
4 to 7 weeks |
| European
Beechwood Dining Chairs |
x |
x |
3 to 4 weeks |
| European
Beechwood Dining Chairs - High Style |
|
x |
4 to 6 weeks |
| European
Beechwood Dining Chairs - Traditional |
|
x |
4 to 6 weeks |
| European
Beechwood Dining Chairs - Eclectic |
|
x |
4 to 6 weeks |
| Rattan Seating
- Upholstered |
|
x |
4 to 6 weeks |
| Tabletops -
Indoor |
|
|
|
| Planked Beechwood Tabletops |
|
x |
3 to 4 weeks |
| Planked Oak Tabletops |
|
x |
3 to 4 weeks |
| Planked Mahogany Tabletops |
x |
|
1.5 to 2.5 weeks |
| Resin Finish Tabletops |
x |
|
1.5 to 2.5 weeks |
| Antique Pine Tabletops |
|
x |
2 to 3 weeks |
| Granite Tabletops |
x |
|
1.5 to 2.5 weeks |
| Acrylic Tabletops |
|
x |
7 to 8 weeks |
| Quarizz Collection Tabletops |
|
x |
3 to 5 weeks |
| Padded Top with Padded Edge Tabletops |
|
x |
4 to 6 weeks |
| Fold-A-Leaf Tabletops |
|
x |
4 to 6 weeks |
| Bumper Edge Tabletops |
|
x |
4 to 6 weeks |
| Self Edge Tabletops |
|
x |
4 to 6 weeks |
| Inlay Wood Edge Tabletops |
|
x |
4 to 6 weeks |
| Overlay Wood Edge Tabletops |
|
x |
4 to 6 weeks |
| Aluminum Edge Tabletops |
|
x |
4 to 6 weeks |
| Table Bases -
Indoor |
x |
x |
1 to 3 weeks |
| Booth Seating |
|
x |
3 to 5 weeks |
| Lodge Style
Hickory Furniture |
|
x |
4 to 7 weeks |
| Emeco Seating |
|
x |
3 to 5 weeks |
| Metal Framed
Seating - Designer |
|
x |
4 to 7 weeks |
| Metal Framed
Seating - Traditional |
|
x |
4 to 7 weeks |
| Banquet
Seating - Aluminum Stackers |
|
x |
4 to 7 weeks |
| Banquet
Seating - Steel Stackers |
|
x |
4 to 7 weeks |
| Banquet Tables |
|
x |
4 to 5 weeks |
| Assisted
Living |
|
x |
5 to 7 weeks |
| Hospitality
Seating |
|
x |
5 to 7 weeks |
| Value Line
Chairs & Tables |
x |
x |
1.5 to 3.5 weeks |